MY RESEARCH PROJECT

Wordcloud of words: Virgin Mary, Middle Ages, Twelfth century, Marian devotion, Devotional practices, Marian miracle tales, William of Malmesbury, Anglo-Norman England.

In the twelfth century there are two parallel developments that fascinate me. The first is the rise of devotion to the Virgin Mary; the second, is the collation and spread of Marian miracle tales. I would like to investigate the relationship between these two parallel developments in my thesis.

I have two aims for this project. First, I want to answer the question of whether Marian miracle tales influenced devotional practices (prayer, celebration of feast days, etc.) to the virgin Mary. Second, I would like to move the discussion surrounding miracle tales in scholarship towards questions of whether miracle tales can be used as sources of theological significance.

Graphic of the Project Timeline represented as a Gantt Chart.  Fulle xplained in the paragrapgh following.
Project Timeline

There are a number of elements to my timeline. There are three main events I need to work around in the next year. These are the literature Review due at the end of March, the Research frontiers Conference held in mid-June, and the thesis due date at the end of October. I aim to have key elements of my research and some ideas about my conclusions thought out by the time of the conference. I also aim to have as much reading as possible completed by mid-April so that I can focus on writing and focused reading on elements I need to know more about. I intend to have finished most of my writing by the end of September so that I can edit, proofread, and rewrite smaller sections if necessary.

I have two ways in which I will manage my data for this project. To make life easier for myself I will organise my electronic files in a logical manner. For me this involves a folder with all of my secondary sources with a file naming convention of Author last name_title of article or book, and if required, _chapter number/name. I will also have a different folder for my written documents with the files split by thesis chapter or section. To ensure that I do not have issues with losing data I will also engage with multiple back up systems. First, I will rely on my family’s automatic encrypted back up system. This system automatically backs up multiple times a day ensuring that I can access recent versions of my work. I will also manually back my computer up every few days so that there is a second copy if something goes wrong.

I am unsure whether I will use digital tools for easing my workflow. I will use MS Word for writing my thesis and note taking while I am reading. I like the idea of using Trello, although I am more inclined to make a physical Trello board.